Running power underground comes down to two choices: a cable or conductor rated for burial, and a depth that matches it. Get either wrong and the inspector will have you dig it up. This guide covers the common wire types and the minimum cover from NEC Table 300.5.

Wire types for underground runs

TypeWhat it isDirect burialIn underground conduit
UF-BCopper branch-circuit cable, solid PVC jacketYesYes
USE-2Single conductor, cross-linked insulation, often dual rated RHH/RHW-2YesYes
URDAluminum duplex, triplex or quadruplex made for direct burialYesYes
THHN/THWN-2Building wire, 90 °C wet ratingNoYes
XHHW-2Building wire, cross-linked insulationNoYes, and well suited to it
NM-BIndoor cableNoNo

Conduit below grade is a wet location (NEC 300.5(B)), so anything pulled into it needs a wet rating, which is why NM-B is never allowed there. For a closer look at the two branch-circuit cables, see UF-B vs NM-B; for conductors in conduit, THHN vs XHHW-2.

Minimum cover depth, NEC Table 300.5

Cover is measured from the top of the cable or raceway to the finished grade. These are the values for the general location (column headings of Table 300.5), for circuits of 0 to 1,000 V:

Wiring methodMinimum cover
Direct-burial cable or conductors (column 1)24 in.
Rigid metal or intermediate metal conduit (column 2)6 in.
PVC or other nonmetallic raceway listed for burial without concrete encasement (column 3)18 in.
Residential branch circuit, 120 V or less, GFCI protected, 20 A or less (column 4)12 in.
Irrigation and landscape lighting circuits of 30 V or less, in UF or other identified cable or raceway (column 5)6 in.

The table has more rows for other locations, and they change the numbers:

  • Under a building: no minimum cover, but the wiring must be in a raceway or be a cable identified for direct burial under a building.
  • Under a 4 in. concrete slab with no vehicle traffic: shallower cover is allowed.
  • Under streets, highways, driveways and parking lots: 24 in. for every method.
  • One- and two-family driveways and outdoor parking areas used only for dwelling purposes: 18 in. for most methods.

Read the whole table and its notes for your situation before you trench.

Other rules that catch people

  • Where it comes up: direct-buried cable that emerges from the ground must be protected from the required cover depth to at least 8 ft above grade, or up to the enclosure it enters (300.5(D)(1)).
  • Warning tape: service conductors buried 18 in. or more below grade need a warning ribbon at least 12 in. above them (300.5(D)(3)).
  • Keep large rocks, paving and sharp material out of the backfill against the cable (300.5(F)).
  • Direct-burial splices need a method listed for burial (300.5(E)).
  • Sealing: a raceway where moisture could reach live parts must be sealed or plugged at one or both ends (300.5(G)).

Choosing a wire for a common job

  • Detached garage, 20 A, 120 V: 12/2 UF-B at 12 in. with GFCI protection, or at 24 in. without it.
  • Subpanel in a shop, 60 to 100 A: aluminum URD direct buried at 24 in., or THWN-2 or XHHW-2 in PVC at 18 in.
  • Well pump at 240 V: UF-B at 24 in. The 12 in. allowance applies only to 120 V circuits.
  • Low-voltage landscape lighting: landscape lighting cable at 6 in.